下一步What comes next

第一個地基之後,接下來做什麼?

After the first foundation, what happens next?

2026 冬季到 2027 春季。

Winter 2026 into spring 2027.

目前節點Current milestone

Grand Café|齋堂 地基

The Grand Café foundation

已募 US$5,000US$5,000 raised US$19,000

來自 6 位護持者,已開立正式收據。本期涵蓋齋堂地基、下一階段木材準備, 以及閉關與園區基本運作。

From six supporters, with formal receipts issued. This season covers the Grand Café foundation, timber preparation for the next stage, and the basic running of the retreat and campus.

一起護持 Support this season
2026 秋Autumn 2026

第一鏟

Breaking ground

Grand Café|齋堂 地基進入施工。 這是瑪南瑜伽母閉關中心第一個可以完成、也可以被驗證的建築里程碑。

The Grand Café foundation goes into construction. It is the first building milestone at Yogini Retreat Manang that can be completed, and verified.

2026 冬Winter 2026

整理、確認、準備

Close out, confirm, prepare

冬季山上停止主要施工,但計畫不會停。這段時間將完成:

Major construction stops on the mountain in winter, but the project does not. During this period we will complete:

第一個施工季的工程與財務回報 · 建照與必要行政程序 · SMA 與 IDCES 依實際施工經驗更新工程量與成本 · 確認 2027 年可執行的施工範圍 · 木材、材料與春季開工前置準備 · 下一施工季的護持與溝通

The construction and financial report for the first season · Permits and necessary administration · SMA and IDCES updating quantities and costs from real construction experience · Confirming what can actually be built in 2027 · Timber, materials and pre-spring preparation · Support and communication for the next season

冬天不是空白,而是下一個施工季的準備期。 Winter is not a blank. It is when the next building season is prepared.
2027 春Spring 2027

雪融,再往上蓋

The thaw, and building upward

現階段規劃有三個方向:

Three directions are planned at this stage:

方向Direction 內容What it means
Grand Café|齋堂 地上結構 Grand Café superstructure 從今年完成的地基繼續往上蓋。 Continuing upward from the foundation completed this year.
閉關房第一階段 First stage of the retreat cottages 21 間閉關房分階段施工,逐步形成真正可以住下來閉關的條件。 The 21 cottages are built in stages, gradually creating conditions where someone can actually stay and practise.
園區水系與基礎設施 Water system and infrastructure 進行必要整地、擋土、排水、供水與其他基礎工程,為後續建築建立穩定條件。 The necessary ground works, retaining, drainage, water supply and other infrastructure, giving later buildings stable ground to sit on.
2027 年預算如何決定 How the 2027 budget will be set

目前數字仍屬規劃與推估。實際地基施工已顯示, 早期估算與瑪南當地人工、材料及運輸成本可能有差距。

The current figures are still planning estimates. Building the foundation has already shown that early estimates can differ from real labour, material and transport costs in Manang.

因此,在 SMA 與 IDCES 完成新的工程量清單與現場報價以前, 不先對外公布尚未確認的 2027 總工程額。 下一階段的公開目標,將以更新後的工程量、實際報價與可驗證的施工範圍為準。

So until SMA and IDCES have completed a new bill of quantities and on-site quotations, we will not publish a 2027 total that has not been confirmed. The next public target will follow the updated quantities, the actual quotations, and a scope that can be verified.

今年先把地基做好。明年雪融,再繼續往上蓋。 Build the foundation this year. When the snow melts, build upward.
查看完整大事記 The full timeline 一起護持 Support this work